The molding process of foam line mortar scraper type B
r
r The moderate line speed of the continuous operation process combines the process requirements with the improvement of production efficiency.
r
r The dual-channel design has one machine for covering small lines and two machines on top. When covering large lines, the two channels are integrated into one, which has sufficient supporting power.
r
r The specially customized chain increases the stress-bearing area of the supporting chain and the supported polystyrene, greatly increasing the total supporting force, which not only protects the perfect line angle but also ensures smooth production. .
r
r Type B foam line mortar scraping machine adopts adjustable frequency conversion technology to control the planetary reducer, and brings a damped tine chain to perform circular motion to push the processed raw materials forward and into the Equipped with a mold silo, the raw material surface is scraped to produce a finished product with smooth surface, high precision and good feel.
r
r Characteristics of the B-type mortar prepared by the foam line mortar scraper
r
r The mortar used in construction is divided into special bonding mortar and surface polymer anti-cracking mortar.
r
r During construction, use a hand-held electric mixer to stir, or the mass ratio of the bonding mortar to be mixed manually is water mortar. Add water while stirring for a mixing time. The mixing must be fully uniform, with moderate consistency, and have Certain viscosity.
r
r After the mortar is prepared, it must be left to stand and stir again before use. The mixed mortar should be used up inside. When used in hot weather or dry days, if the mix is too large, a small amount of water can be added. However, water should not be added after the slurry has lost water and hardened or has begun to condense for too long.
r
r Technical requirements for foam line mortar scraper type B
r
r The surface of the base layer treatment and pasting should be as smooth, strong and clean as possible. If necessary, it can be properly polished with coarse sandpaper. Decorative components should be pressed tightly together.
r
r Material Preparation: Add water according to the weight of the product, stir mechanically for 10 minutes, and let stand for 10 minutes before use.
r
r For material construction, use a stainless steel plastering knife to apply the crack-resistant plastering mortar onto the surface of the decorative components, and press the fiberglass mesh into the wet plastering mortar for leveling. The joints of the fiberglass mesh cloth should be overlapped, and the width should not be less than 1. The fiberglass mesh cloth must be completely embedded, and the thickness of the anti-crack plaster surface layer should be approximately.
r
r Construction conditions Construction temperature is above +℃ and below relative humidity.
r
r Drying schedule dry hours/℃. Drying time will vary with ambient temperature and humidity.
r
r Tool cleaning.